You've just acquired a remanufactured JLR engine from Rover Parts Depo (RPD), and you're eager to unleash its power on the open road. But hold on – before you embark on high-speed adventures, there's an essential journey your engine needs to take first. In this article, we'll explore the vital break-in process for your JLR engine and why it plays a pivotal role in ensuring its long-lasting reliability.
Before we dive into the specifics, let's understand what the break-in process is all about. The break-in process is the period during which your newly installed or remanufactured engine gets accustomed to its surroundings and operating conditions. It's like a warm-up routine for your engine, preparing it for peak performance while extending its lifespan.
Before your new RPD engine is installed, it's crucial to address any existing issues with your vehicle. Problems with external devices, such as the transmission, transfer case, differential, or cylinder head, can potentially affect your engine's performance and warranty. To prevent this, ensure all devices are in proper working order.
Prior to engine start-up, your engine must be properly primed with oil to prevent a dry start and potential engine damage. If you encounter difficulties in achieving proper oil pressure, consult with an RPD representative for guidance.
On certain engines, especially after several heat cycles, valves may need readjustment to meet vehicle specifications. This adjustment is a crucial part of the installation process and is not considered a warranty issue.
During the break-in period, your RPD engine should be run using break-in oil. The use of synthetic oil during this phase may inhibit proper sealing of components and result in extended oil consumption.
Here's a general guideline:
Proper maintenance, including oil changes every 3,000 miles, is vital to flush out contaminants and prevent buildup, which can lead to premature engine failures. Maintain daily checks on engine oil levels, as some oil consumption is expected during the initial 3,000 to 4,000 miles of driving.
Proper break-in driving should not include heavy loads, trailer use, or aggressive driving. Optimal conditions involve city driving with stop-and-go traffic and varying engine RPMs.
Consult your vehicle's manual or the recommendations provided by Rover Parts Depo for specific break-in guidelines. Different engines may have slightly different requirements.
The break-in process requires patience, but the long-term benefits are well worth it. A properly broken-in engine tends to have increased longevity and performance.
As you embark on the journey of breaking in your newly installed or remanufactured JLR engine, remember that proper care during this crucial phase sets the stage for years of reliable performance and durability. The information provided here serves as a general guideline for the break-in process.
For comprehensive details and specific instructions regarding the installation and break-in process, we recommend referring to the warranty page on the Rover Parts Depo (RPD) website. This page contains in-depth information, responsibilities, and steps to ensure your engine's longevity.
If you have questions about the break-in process, need further guidance on engine care and maintenance, or require clarification on any aspect of our products and services, don't hesitate to reach out to our team of JLR engine experts at RPD. We're here to assist you every step of the way, ensuring you get the most out of your engine for years to come.
Our remanufactured engines are designed to provide years of trouble-free service. In order for your engine to perform as expected, it must be installed correctly, operated responsibly and properly maintained.
ENGINES AND CYLINDER HEADS
Once the product has been installed, it is the owner’s responsibility to break-in the product properly. After the break-in period and 600 mile checkup, the product must be maintained to the original manufacturer’s specifications.
INITIAL STARTUP
When applicable, valves must be readjusted to your vehicle’s manufacturer’s specifications.
BREAK-IN PROCEDURES
Your remanufactured engine requires special care during its initial “break-in” period. To ensure your engines long life expectancy and proper engine performance, please follow these procedures during the first 600 miles of operation.
Do not drive for long periods at any single speed, always vary your speed.
Do not tow a trailer or put other heavy loads on the vehicle.
Check the engine oil and coolant levels daily.
600 MILE CHECKUP: (NOT COVERED UNDER THE WARRANTY TERMS)
Check fuel and ignition settings.
Change engine oil and filter.
Adjust Valves (where applicable).
Manufacturer does not recommend using synthetic engine oil until after the first 5,000 miles. Follow your vehicle owner’s manual for service intervals.
Failure to perform these procedures can result in damage to the product that will not be covered under your warranty.Please retain all service records (repair orders, invoices, etc) related to your remanufactured engine product maintenance and service. In the event of a product failure you will be required to provide copies of installation invoice and all maintenance records covering the installed product.Original service records from authorized service center must be kept during warranty period. Personal maintenance records are not accepted. Oil and temperature light/gauge and speedometer MUST be in the proper working order.